Oil & Gas — Downstream · SaaS / Bare Metal
Unplanned Shutdown & Downtime Avoidance
Single equipment failures propagate through interconnected units. Industry average: 27 days unplanned downtime per year.
Scenario
Distillation column near flooding increases downstream compressor load, accelerating bearing wear without triggering alarms.
How AICraft solved it
Cross-unit real-time monitoring → Anomaly identification across systems → Risk flagged before shutdown → Operator guidance.
$15M
Per Shutdown Avoided
99.2%
Plant Availability
30–40%
Downtime Reduction
More stories
Other deployments
Consistent Yield Across Every Batch
The Problem
Yield swings 4–7% between batches of the same recipe. Operators compensate manually, and the root cause is invisible to the DCS because it lives in the interaction between charge quality, jacket temperature and agitation.
SCENARIO: A reactor charged with a slightly wetter feedstock reaches the exotherm peak two minutes late; the fixed recipe ramp then overshoots, driving impurity formation that only shows up in end-of-batch assay.
What PilotX Did
IT/OT/ET data unified in the Knowledge Base → Forge learned the reaction physics from historical batch signals → Deviations from the proven yield trajectory detected in-batch → PilotX recommended setpoint corrections to the operator before the exotherm peak.
Outcomes
62%
Yield Variance Reduction
+2.4%
Average Yield Uplift
$4.1M
Annual Value
Batch Cycle Time Compression
The Problem
Batch cycle times drift upward season by season. Hold steps are sized for worst-case conditions, so every batch pays for the slowest possible heat transfer.
SCENARIO: Jacket fouling slows cooling by 11 minutes per batch. The recipe timer absorbs the loss silently, costing three batches per month of lost capacity.
What PilotX Did
Forge modelled heat-transfer behaviour per reactor → Golden-batch trajectories established from proven runs → Cycle-time loss attributed to specific phases → PilotX issued dynamic phase-duration guidance and fouling-driven cleaning triggers.
Outcomes
14%
Cycle Time Reduction
+310
Additional Batches / Year
$6.8M
Capacity Value Unlocked
Next step
Run the same play on your plant
We map the platform to your live batch records and show exactly where yield, quality and cycle time move — .