Utilities · SaaS / BYOC

    Network-Level Loss Intelligence

    Losses accumulate gradually across zones. Control systems only see local measurements, never system-wide behavioural patterns. DMA inflow exceeds billed consumption by 12%.

    How AICraft solved it

    Ingested network telemetry → Learned zone/feeder normal behaviour → Detected real-time loss patterns → Surfaced location, trend and monetary impact.

    3–5%

    Loss Reduction

    $2M+

    Emergency Repair Savings

    40%

    Regulatory Risk Reduction

    More stories

    Other deployments

    ChemicalsBYOC / Bare Metal

    Consistent Yield Across Every Batch

    The Problem

    Yield swings 4–7% between batches of the same recipe. Operators compensate manually, and the root cause is invisible to the DCS because it lives in the interaction between charge quality, jacket temperature and agitation.

    SCENARIO: A reactor charged with a slightly wetter feedstock reaches the exotherm peak two minutes late; the fixed recipe ramp then overshoots, driving impurity formation that only shows up in end-of-batch assay.

    What PilotX Did

    IT/OT/ET data unified in the Knowledge Base → Forge learned the reaction physics from historical batch signals → Deviations from the proven yield trajectory detected in-batch → PilotX recommended setpoint corrections to the operator before the exotherm peak.

    Outcomes

    62%

    Yield Variance Reduction

    +2.4%

    Average Yield Uplift

    $4.1M

    Annual Value

    ChemicalsSaaS / BYOC

    Batch Cycle Time Compression

    The Problem

    Batch cycle times drift upward season by season. Hold steps are sized for worst-case conditions, so every batch pays for the slowest possible heat transfer.

    SCENARIO: Jacket fouling slows cooling by 11 minutes per batch. The recipe timer absorbs the loss silently, costing three batches per month of lost capacity.

    What PilotX Did

    Forge modelled heat-transfer behaviour per reactor → Golden-batch trajectories established from proven runs → Cycle-time loss attributed to specific phases → PilotX issued dynamic phase-duration guidance and fouling-driven cleaning triggers.

    Outcomes

    14%

    Cycle Time Reduction

    +310

    Additional Batches / Year

    $6.8M

    Capacity Value Unlocked

    Next step

    Run the same play on your plant

    We map the platform to your live batch records and show exactly where yield, quality and cycle time move — .